The voice of the ASEAN people

INSIDE·ASEAN

Connecting ASEAN with the World

Laos

Laos Sentences Two Former EDL Officials to Life in $31.2 Million Case

The Vientiane court said irregularities in two proposed transmission-line projects caused state losses of $31.2 million, including through inflated equipment quantities and project financing.

By Anousone Saysana25 November 20263 min read
Laos Sentences Two Former EDL Officials to Life in $31.2 Million Case

Two former senior officials at state power utility Électricité du Laos (EDL) have been sentenced to life imprisonment over a case that the Vientiane Capital People’s Court said caused the state losses of US$31.2 million. The court announced its verdict on 23 November, after ruling on 20 November that the men were guilty of corruption, money laundering and forgery or the use of forged documents.

The defendants were former EDL Director General Sisavath Thiravong, 67, and Kham Mingboupha, 57, formerly head of the utility’s Transmission Line Survey and Design Office. Both had been detained since July 2025, according to the court statement.

The court ordered Sisavath to pay a fine and civil damages based on US$29.5 million, and Kham to pay the same forms of penalty based on US$1.8 million. The court said those amounts corresponded to the losses attributed to each man and totalled US$31.2 million.

Two transmission projects at the centre of the case

The case concerned proposed construction of the Tha Vieng–Lak 20 230-kilovolt transmission line and the Nam Phai–Thong Khoun 2 115-kilovolt line. According to the court, the defendants sought approvals in 2013, including permission to import electrical equipment, before feasibility studies and construction designs were in place. The court also said reliable calculations of work volumes and unit prices were lacking.

For the Tha Vieng–Lak 20 project, the approved import list specified 3,546 tonnes of electrical cable valued at US$20.5 million. The project’s bill of quantities listed 2,800 tonnes, while the court said only 1,942 tonnes, worth about US$11.2 million, were used. It put the value of the 1,604-tonne discrepancy at about US$9.3 million.

The court said the project’s value was later adjusted to US$198.8 million to secure additional loan financing. Sisavath and Kham signed an engineering, procurement and construction contract with China’s Norinco for that amount on 1 December 2014, according to the statement.

By May 2016, the project was 42.13% complete, the court said. An inspection later valued the project at US$155.1 million and the construction work actually carried out at US$123.9 million. An inspection summary dated 5 April 2023 put the resulting loss to the state at US$31.2 million, according to the court.

Alleged concealment of proceeds

The court said the two officials abused their positions and altered or falsified documents to obtain benefits for themselves and others. It said Sisavath arranged for family members to draft loan agreements intended to disguise the origins of illicit funds, and directed a former secretary to establish a company and open nine bank accounts to receive proceeds.

Kham, the court said, gave guidance and information to people and entities connected to his official duties to help them secure benefits. The court also said the defendants concealed assets through purchases of land, vehicles, gold and other valuables, investments in businesses and financial products, and construction of hotels, apartments, houses and resorts.

EDL is Laos’ state electricity utility, involved in the country’s power system and in electricity imports and exports. The case concerns transmission infrastructure, which carries electricity between parts of the grid, rather than a power-generation project.

Other cases involving state institutions

The verdict follows a separate set of corruption cases announced by the Vientiane Capital People’s Court in July. According to reporting by Nation Thailand, those cases involved 17 defendants and resulted in at least 10 life sentences. One case concerned a hydropower project under EDL and included a Thai businessman and four former EDL executives; the court did not publicly identify the project in detail.

In a separate report, the Vientiane Times said former EDL officials and contractor staff had also faced prosecution over alleged corruption and fraud connected to the unfinished Hinboun Hydropower Project. That report said an inspection found the project was 76% complete, although the developer had been paid 98.64% of its contract cost. The Hinboun case is distinct from the transmission-line projects in the latest verdict.

The State Inspection Authority reported in November 2025 that it had uncovered corruption involving 334 people between 2021 and 2025, according to the court statement’s account of the authority’s findings. The authority said 86 suspects had been referred for prosecution and 23 convicted.